Client
|
Project
|
Place
|
Scope
|
Period
|
Price US$
|
Konoike- Veideike-Murray & Roberts J.V.
|
Sondu/Miriu Hydro Power Project.
|
Kisumu. Kenya
|
Site Coordination earthworks and blasting works.
|
1999–2003
|
$396,000.00
|
Konoike- Veideike-Murray & Roberts J.V.
|
Sondu/Miriu Hydro Power Project.
|
Kisumu. Kenya
|
Tunnel excavation & Lining works.
|
1999–2002
|
$1,700,000.00
|
Kumagai – Kadi J.O.
|
Inco – Rockfill Dam.
|
Soroako, Sulawesi.
Indonesia
|
Coordination earthworks blasting works.
|
1996–1998
|
$230,500.00
|
Mizutani Kensetsu Co. Ltd.
|
Bali Reclamation Works.
|
Bali. Indonesia
|
Site coordination earthworks works.
|
1996–1998
|
$230,500.00
|
Kumagai – Wika J.O.
|
Besai Hydro Dam Project.
|
Kota Bumi,
Lampung. Indonesia
|
Site coordination for tunnel and earth works.
|
1996–1998
|
$266,500.00
|
Transfield project
(M) Sdn. Bhd.
|
New Karak Tunnel Project.
|
Karak, Perak.
Malaysia
|
0.75KM Tunnel excavation works.
|
1995–1996
|
$600,000.00
|
Hazama Gumi Co. Ltd.
|
LRT Project.
|
Kuala Lumpur, Malaysia
|
2.8 KM Tunnel excavation work.
|
1995–1996
|
$1,500,000.00
|
Peabody Resources Corporation Sdn. Bhd.
|
Sungei Kelinchi Transfer Tunnel.
|
Perak. Malaysia
|
6.5 KM Tunnel excavation works.
|
1994–1996
|
$2,180,000.00
|